or 01379 652613 | Contact us
Online shop
My source
All about wood floors
Blog


home > installation & finishing > installing woodfloors > woodflooring installation methods

other pages in this section:

Floated wood floor

First check the sub floor condition to ensure that it is even, sound and free of excessive moisture. Use levelling compound and moisture barrier as necessary.

Then layout the underlay onto the sub floor and then apply PVA wood flooring glue along the top surface of the tongue. The top joints should be filled with glue when securing the boards together.

Where necessary use a tapping block to tap the boards to fit snugly into the T&G joint. Remove the excess glue as soon as possible by using a damp cloth or sponge.

> Bonded woodfloor (full stick down)
> Secret nailed woodfloor
> Floated woodfloor


> back a page







Like us on Facebook    Follow us on Twitter
Member: National Wood Flooring Association